Fully Adhered EPDM
|

|

|
|
Insulation is installed and mechanically
attached to the substrate.
|
The EPDM membrane is set in place and
building adhesive is applied to both the EPDM membrane and the insulation.
|
|

|

|
|
The EPDM membrane is rolled into place
bonding the insulation to the membrane.
|
The EPDM membrane is broomed down to insure
maximum adhesion.
|
|

|

|
|
A butyl seam tape is installed.
|
The overlapping EPDM
membrane seam is hand rolled for maximum adhesion.
|